by Metro Testing | May 17, 2019 | Concrete Restoration
METRO TESTING + ENGINEERING ROLE: Materials Testing – Soils and Concrete Shotcrete to create the tunnel The Construction of the new Second Narrows Water Supply Tunnel is now underway; it is one of five new tunnel crossings being built in the region. The new...
by Metro Testing | May 3, 2019 | Concrete Restoration
METRO TESTING + ENGINEERING ROLE: Partnering with Lafarge Canada Inc., Metro Testing + Engineering’s Role on the interchange Projects includes: Concrete, grout, shotcrete – field and lab testing Soils/ granular – field and lab testing Asphalt – field...
by Metro Testing | May 1, 2019 | News
‘The rebranding of CCMET to Metro Testing + Engineering is to achieve greater clarity on the services we offer as a group. We want our company name to reflect the Metro Way; “Partnering with our clients to provide industry-leading testing, engineering, and consulting...
Recent Comments