by Metro Testing | May 17, 2019 | Concrete Restoration
METRO TESTING + ENGINEERING ROLE: Materials Testing – Soils and Concrete Shotcrete to create the tunnel The Construction of the new Second Narrows Water Supply Tunnel is now underway; it is one of five new tunnel crossings being built in the region. The new...
by Metro Testing | May 3, 2019 | Concrete Restoration
METRO TESTING + ENGINEERING ROLE: Partnering with Lafarge Canada Inc., Metro Testing + Engineering’s Role on the interchange Projects includes: Concrete, grout, shotcrete – field and lab testing Soils/ granular – field and lab testing Asphalt – field...
by Metro Testing | Apr 30, 2019 | Concrete Restoration
METRO TESTING + ENGINEERING ROLE: Materials Testing Geotechnical Engineering Specialty Testing Glenmore Dam was built in 1932 and since then the dam has played an integral role in Calgary’s water infrastructure system. The dam holds back the Glenmore Reservoir (a...
by Metro Testing | Apr 30, 2019 | Concrete Restoration
METRO TESTING + ENGINEERING ROLE: Concrete Repairs Upgrades on the Cleveland Dam Spillway Cleveland Dam is a 91 m high concrete dam that sits atop Capilano River Regional Park in North Vancouver. The dam was built in the early 1950’s and boasts an impressive...
Recent Comments